Masonry

Sustainable Sites
Points
Credit 2
Development Density & Community Connectivity
1
Credit 5.1
Site Development, Protect or Restore Habitat
1
Credit 5.2
Site Development, Maximize Open Space
1
Credit 6.1
Stormwater Design, Quantity Control
1
Credit 6.2
Stormwater Design, Quality Control
1
Credit 7.1
Heat Island Effect, Non-Roof
1
Credit 7.2
Heat Island Effect, Roof
1
Energy and Atmosphere
PRQ 2
Minimum Energy Performance
Required
Credit 1
Optimize Energy Performance
10
Materials and Resources
Credit 1.1
Building Reuse, Maintain 55%-95% of Existing Walls, Floors, and Roof
1-3
Credit 1.2
Building Reuse, Maintain Interior Nonstructural Elements
1
Credit 2
Construction Waste Management, Divert 50% - 75% materials from Disposal
1-2
Credit 3
Materials Reuse, Salvage and Reuse 5% - 10% materials
1-2
Credit 4
Recycled Content, 10% - 20% (post-consumer plus ½ pre-consumer)
1-2
Credit 5
Regional Materials, 10% - 20% Extracted and Manufactured within 500 miles of project site
1-2
Indoor Environmental Quality
Credit 3.1
Construction IAQ Management Plan, During Construction
1
Credit 4.1
Low-Emitting Materials: Adhesives & Sealants
1
Credit 4.2
Low-Emitting Materials: Paints & Coatings
1
Credit 7.1
Thermal Comfort, Design
1
Innovation and Design Process
Credit 1 – Up to 5 Points
Structural Advantages
1
Life-Cycle Benefits
1
Acoustic Performance
1
Improved Air Quality
1
Regional Priority Credits
 
Credit 1
Regional Priority Credit
1-4